CIP 8098A - Dover South Storm Realignment

Storm Drain Realignment at Dover Lane near Oleson Road (Dover South)

Project Description: Rehabilitate, replace, and/or realign storm drain pipes that are both old and difficult to access for maintenance. 

Project Manager: L. Alan Johansson, 503-526-7595 

Project Status:

FY11/17:  Continue study of the existing storm drain pipes and sewer system and develop design. 

FY11/17: Project design. 

FY17/18: Begin construction. 

Substantial Completion Date: FY 17/18 

CIP 8098A Description

GoogleEarth map of Dover South area.