City of Beaverton Community Development

BeavertonOregon.gov/CDD


City of Beaverton Community Development

Contact CDD  |  City of Beaverton

Translate

City of Beaverton.

CDD Home

Permits

Codes

Building

Planning

Resources

Comprehensive Plan Volume IV—Transportation System Plan

Back Back

Volume I

Comprehensive Plan

Volume II

Background and Supporting Materials

Volume III

Statewide Planning Goal 5 Inventories

Volume IV

Transportation System Plan

Volume V

Community Plans

If you have problems viewing non-html files (pdf, doc, xls, etc…) we recommend that you download them first. To download a non-html file, right-click on the link and choose “Save Target As…” (in Internet Explorer), “Save As…” (in Netscape) or “Save Link As…” (in Firefox).

Comprehensive Plan Volume IV
Ordinance 4062 Effective 10/14/1999
Note: The complete Transportation System Plan Update and initial Transportation System Plan are available by clicking on the links provided below. The Change Log identifies changes to the 2001 draft of the Transportation System Plan Update. The Transportation System Plan Update and its Change Log were adopted by Ordinance No. 4252 and became effective on June 6, 2003.
Update of Beaverton’s Transportation System Plan
(September 2001–2020 Forecast Year)
Change Log (PDF)
Table of Contents (PDF)
Chapter 1:  Summary (PDF) 5.04 MB
Chapter 2:  Goals and Policies (PDF) 155 KB
Chapter 3:  Existing Conditions (PDF) 3.9 MB
Chapter 4:  Future Needs/Improvement Plans (PDF) 5.91 MB
Appendices:
Appendix A:  Issues Report (PDF)
Appendix B:  TAZ Map & Land Use (PDF) 1.6 MB
Appendix C:  Traffic Counts (PDF) 9.55 MB
Appendix D:  Motor Vehicle Analysis (PDF) 2.91 MB
Appendix E:  Local Connectivity Maps (PDF) 7 MB
Appendix F:  Functional Class Matrix (PDF)
Appendix G:  Metro Regional Model Transit Headway Data (PDF)
Appendix H:  Existing (2000) LOS Calculations (PDF) 160 KB
Appendix I:  2020 RTP Priority Network Base LOS Calculations (PDF) 155 KB
Appendix J:  2020 TSP Mitigated LOS Calculations (PDF) 229 KB
Appendix K:  LOS Interpretation HCM 2000 Methodology (PDF)
Appendix L:  Metro Street Design Policies/Designations (PDF) 1.3 MB
Appendix M:  City of Beaverton SPIS (PDF)
Appendix N:  Proposed Lane Configurations and Additional Items (PDF) 1.84 MB
Transportation System Plan
(September 1997–2015 Forecast Year)
Cover Page (PDF)
Ordinance (PDF)
Change Log (PDF) 329 KB
Introductory Information (PDF)
Chapter 1:  Summary (PDF) 1.3 MB
Chapter 2:  Goals and Policies (PDF) 380 KB
Chapter 3:  Existing Conditions (PDF) 1.6 MB
Chapter 4:  Future Demand & Land Use (PDF) 154 KB
Chapter 5:  Pedestrians (PDF) 395 KB
Chapter 6:  Bicycles (PDF) 421 KB
Chapter 7:  Transit (PDF) 162 KB
Chapter 8:  Motor Vehicles (PDF) 2.45 MB
Chapter 9:  Other Modes (PDF)
Chapter 10:  Transportation Demand Management (PDF) 408 KB
Chapter 11:  Funding/Phasing (PDF) 793 KB
Appendices:
Appendix A:  Summary of transportation related past plans & policies (PDF) 331 KB
Appendix B:  Traffic counts (PDF) 4.9 MB
Appendix C:  Volume surveys (PDF) 1.2 MB
Appendix D:  Vehicle occupancy surveys (PDF) 674 KB
Appendix E:  Level of service descriptions (PDF)
Appendix F:  Level of service calculations (PDF) 8 MB
Appendix G:  Computer simulation photographs (PDF) 887 KB
Appendix H:  Intersection improvement graphics (PDF) 326 KB
Appendix I:  Metro land use data (PDF) 634 KB
Appendix J:  Strategies evaluation scoring (PDF) 208 KB
Appendix K:  Metro classification definition (PDF) 759 KB

Stay Informed

If you want to receive e-mail announcement of updates to the City of Beaverton Comprehensive Plan,